Notification of annual lift in
The annual spring lift in of leisure craft is planned for tomorrow, Tuesday 26th April [weather permitting].
Operations are expected to commence from 8:30am with vessels being lifted from the hard standing into the cut.
There will be heavy lifting equipment and increased activity in the area around the hard standing and the Red Bridge.
The bridge will be temporarily lifted throughout the day to accommodate vessel movements.
We aim to minimise any disruption to pedestrians and forklifts requiring access.
Any operational queries should be directed to the Harbour Master in the first instance on:
018907 50223 / 07885 742505.
Thank you for your cooperation